ICT Infrastructure - Category Home
ICT Infrastructure - Topics
Retrofitting liquid cooling into a hall built for air
The migration ends in a permanent hybrid instead of the promised exit
Migrating file shares to the cloud: what egress and latency add to the bill
Hot aisle containment mistakes that short-cycle the return air
A hyflex room where the students at home cannot hear anyone but the lecturer
Lithium racks inside the white space and what the fire code says
An IT asset register that goes wrong within a quarter
Standby power across thousands of network devices nobody switches off
Dual-site active-active: how far apart can the two halls actually be
The last physical servers: what still runs on bare metal and why
Generator testing: the standby that fails on the day it is needed
Timing and synchronisation: why a GPS outage takes cells off the air
One failed line card keeps a site down four months waiting on a spare from overseas
Phase two of a connectivity project starts while phase one sites still have no as-built documentation
Raised floor vs overhead cabling as rack density grows
Every firmware upgrade needs a vendor engineer flown in because no one on site holds the console credentials
Acoustic leak sensors under a hundred-year-old water main mean digging up the street to fit them
A donor-funded fibre backbone is handed over with no one trained to run the network operations centre
Certificate expiry took down ten thousand devices and no one had an inventory
Hub and spoke vs full mesh: what each topology costs when one site goes dark
Colocation cage vs build-to-suit hall: what the contract commits you to
What to ask on a data center tour about generator testing
Getting PUE below 1.2 in a hot climate
Cooling a small server room when the building air conditioning runs office hours
Moving servers to colocation: what the lease hides about power pricing
Consolidating three data centres into one changes who is on call at two in the morning
Site survey tools disagree about the same floor: which heat map should decide access point placement
A disaster recovery site nobody tests is a plan on paper
N+1 vs 2N on the UPS side and what it costs
Server room UPS batteries: how long the load really runs after the mains drop
Point-in-time recovery: how long a restore takes on a 2 TB database
Restoring from a cross-region backup is not a disaster plan until you have timed it