ICT Standards - Topics
Procurement clauses that require WCAG and EN 301 549 conformance
How PUE gets gamed when a data center reports its own efficiency
A proprietary sensor protocol turns a platform renewal into a citywide rip and replace
What the EU Cyber Resilience Act asks of a connected device maker
R2 and e-Stewards: what auditors check before a recycler is approved
Evaluating a digital therapeutic before a payer will cover it
One clause in a revised standard and a whole product line needs recertification
Open standards vs open source: the confusion that stalls public procurement
The same USB-C port on two laptops supports completely different things
FHIR interfaces between a hospital and a lab still speaking an older standard
ITU filings: how spectrum is reserved for satellites that have not been built
Vendor seats on a standards committee decide which features get specified
Standard-essential patents: the FRAND promise and the royalty stack
Reference implementations that decide how everyone actually reads the specification
Post-quantum signatures inside a passport that must stay valid for ten years
Cross-border eID: what a bank in one member state can and cannot trust from another's scheme
An exam on paper for a subject whose whole point is debugging at a keyboard
Security requirements that belong in an IoT tender before a vendor is picked
Certification testing: what the logo on the box does and does not prove
National standards bodies adopting an international standard with local deviations
When two standards bodies specify the same thing in incompatible ways
Matter and Thread interoperability inside a building full of legacy gear
A national eID that signs your tax return is refused when you try to open a bank account with it
A browser engine becomes the standard when enough sites only test against it
Water consumption in cooling: the metric missing from most sustainability reports
Some chargers have to handshake with the device before they will fast charge
Patent pools for video codecs: why every device ships with a licence fee
End-of-life disposal: what a constellation operator has to plan for before launch
CIDR aggregation: how one route entry replaces hundreds of classful networks
Hybrid broadcast and broadband needs a return path and a fallback before a red button works
Writing accessibility requirements into a digital tool purchase
Who audits a certification lab that has never failed a submission